Description
Your fire department has recently completed annual hose testing as required by NFPA standards. Approximately 50% of your hose either failed or barely passed. You have enough spare hose to re-load your 4 engine companies and the lone reserve engine.
Provide a proposal (5-8 pages) for a replacement program for all of the hose inventory.
Include all costs associated with the program and assume a standard engine hose load with LDH, 2 ½, 1 ¾, etc.
Include PowerPoint (5-8 slides) that outlines the proposal.